Bottleneck Revenue

Revenue arising when capacity limitations in power transmission between price areas exist - accrues to the system operator.

Congestion revenue arises when transmission capacity between two bidding areas is fully utilised and there is a price difference between them. Nord PoolNordic electricity exchange where power is traded in the wholesale market - the basis for electricity prices in Norway and the Nordic region. auctions the right to transport power across the bottleneck - the difference between the buying and selling price constitutes the congestion revenue. In Norway, these revenues accrue to StatnettNorway's system operator for the transmission grid - owns and operates the high-voltage network and operates Elhub., which is obliged to use them to increase capacity and reduce the bottleneck over time. In periods with a large price difference between southern Norway (high price, cable exports) and northern Norway (low price, abundant water), congestion revenues are significant. Politically, congestion revenues are a sensitive topic: they make it visible that Norwegian consumers pay a higher price because export capacity is limited - and that interconnectorsSubsea power cables connecting the Norwegian electricity grid to Europe - crucial for hydropower exports and imports in dry years. contribute to price increases.

MarketInfrastructureEconomics