Insights

Articles & Insights

Knowledge from our team - news, case studies, technical blog and analysis from the energy industry.

The standard that is not one
Article3 min read
Del 2 · The Nordics are not one market

The standard that is not one

'We follow the Nordic standard' is a sentence that reassures and explains nothing. There are several of them, and they are not translations of each other.

Geir Ove Drevland
Three hubs, and one country still waiting
Article4 min read
Del 1 · The Nordics are not one market

Three hubs, and one country still waiting

The Nordic power market looks continuous from the outside. Travel east from Norway and you do not meet a hub with different interfaces. You meet no hub.

Geir Ove Drevland
The value that was corrected
Article4 min read
Del 3 · The quality of a metering value

The value that was corrected

The correction takes thirty seconds. The question that arrives two years later is why it was made, and by whom. The correction is not the job.

Geir Ove Drevland
The gaps that have to be filled
Article3 min read
Del 2 · The quality of a metering value

The gaps that have to be filled

Settlement cannot wait for a meter that is down. The value gets calculated, and then only one question matters: can the recipient see that it was calculated?

Geir Ove Drevland
Eight rules that look at a metering value
Article4 min read
Del 1 · The quality of a metering value

Eight rules that look at a metering value

A metering value that passes validation has not been proven right. It has merely not been proven obviously wrong. That difference is the whole discipline.

Geir Ove Drevland
Elhub data without a market role
Article3 min read
Del 2 · The metering value chain

Elhub data without a market role

A power producer wants its own consumption and its own production back from Elhub. Access is solved. The problem is that the system meant to receive them was never built to talk to a hub.

Geir Ove Drevland
The window before seven
Article4 min read
Del 1 · The metering value chain

The window before seven

Between midnight and a quarter to seven, a full day has to be collected, validated and delivered. The window has not grown, but since January 2024 four times as much has to pass through it.

Geir Ove Drevland
Tvimenning achieves ISO 27001 certification
News1 min read

Tvimenning achieves ISO 27001 certification

We have passed ISO 27001:2022 certification. An important step for us and a reassurance for our customers in an industry where data security is not optional.

Jon Petter Hjulstad
Tvimenning is registered in Achilles UNCE
News2 min read

Tvimenning is registered in Achilles UNCE

Grid operators and producers look for suppliers in Achilles. From 26 May 2026 we are there, fully registered in Utilities Nordics and Central Europe.

Jon Petter Hjulstad
STUBB receives SkatteFUNN approval from the Research Council of Norway
News1 min read

STUBB receives SkatteFUNN approval from the Research Council of Norway

The Research Council approved all three work packages without changes. The project runs for three years, and the approval says the work is genuine research and development.

Jon Petter Hjulstad