Early phase 2026 - limited slots

For you in the energy industry

We are in an early phase and looking for the right customer partners. Here are the challenges we are built to solve - and who we build for.

Early phase 2026

We are onboarding a limited number of pilot customers

We prioritise energy companies that want to build the products together with us - with direct access to the team and product direction, closer follow-up and predictable onboarding. In this phase, focus beats breadth.

Direct access to the product team
Influence product direction and priorities
Predictable onboarding - up and running in weeks
Become a pilot customer

Challenges we are built to solve

These scenarios reflect typical industry challenges. Customer stories will be published here as we onboard our first customers.

Situation

A DSO with hundreds of thousands of metering points struggles with inconsistent master data, manual validation processes and recurring discrepancies in Elhub reporting. Data quality is taking time away from operations.

DSO - distributionDistribution
Situation

An energy retailer handling Elhub communication manually spends a disproportionate amount of time formatting, following up and troubleshooting messages - time that should go to the customer.

Energy retailer - power tradingPower trading
Situation

A municipal energy utility lacks traceability in the VEE process. Estimation is done manually in spreadsheets, and auditing requires hours of documentation that should be automatic.

Municipal energy utility - distributionDistribution and billing

Common use cases

For DSOs

  • SPIRAMaster dataThe authoritative source data in a System of Record (Master) - data owned, maintained and edited in one place, from which all other systems retrieve copies. and metering pointThe fundamental unit in Elhub - the unique point in the electricity network where energy is measured and settled, identified by an 18-digit GSRN number. administration
  • SEFTAValidationThe first step in VEE - automated checks of metering data against technical and logical limits to detect obviously erroneous values. and estimationThe second step in VEE - calculation of missing or rejected metering values based on historical patterns, neighbouring meters or statistical models. of measurement series before submission
  • RUNAComponentA replaceable part inside a fixed asset. It has its own age, its own history and its own service life - independent of the asset it sits in. register for electrical installations
  • STUBBEnd-to-end testing without touching production
  • SAMTYGDElhubNational hub for metering data and market processes in the Norwegian electricity market. message handling and market integration
  • FRAMSYNCondition-based maintenanceA maintenance tactic: continuously monitor a component's condition and intervene when the data shows a deviation - not on a fixed calendar. What FRAMSYN does in practice. of grid components
  • LEIDANGReuse of components across companies

For energy retailers

  • SAMTYGDMessage flow and Elhub integration
  • SPIRACustomer data and contract administration
  • STUBBSafe testing of integrations and migrations
  • SEFTAValidated volumes as the basis for settlementTurning metering data into money. Consumption and production per metering point become what each party owes or is owed.
  • HANDSALEDIElectronic Data Interchange - standardised electronic exchange of business documents between systems. exchange with market participants and partners

For producers

  • SPIRAFacility and metering point register for production units
  • RUNAComponent register for production facilities
  • STUBBEnd-to-end testing of operational systems
  • SEFTAValidation and estimation of production measurement series
  • FRAMSYNMaintenance orders based on actual condition
  • LEIDANGBuying and selling surplus components

For metering services

  • SAMTYGDSystem integration and message flow
  • SPIRAMeter fleet administration and traceability
  • STUBBSafe testing before production deployment
  • SEFTAVEEValidation, Estimation, Editing - systematic process to ensure quality of raw metering data from electricity meters. workflow with a traceable estimation cascade
  • HANDSALMessage exchange over EDIELNordic profile of the EDI EDIFACT standard - used for electronic message exchange in the Nordic power market via Elhub., AS4Open OASIS standard for secure message exchange over HTTP - the transport protocol required by Peppol, increasingly seen in European power-market messaging too. and PeppolEuropean network for e-invoicing and e-procurement - uses AS4 as its transport protocol. Norway is among the countries with mandatory e-invoicing via Peppol for the public sector.
Elhub-approved
Privacy (GDPR)
Data storage EU/EEA
Event notification

Become one of our first customers

We are in an early phase and looking for energy companies that want to shape the products together with us. Get in touch for a no-obligation conversation.