Articles & Insights
Knowledge from our team - news, case studies, technical blog and analysis from the energy industry.

The consent that opens the door
The question is rarely whether the data exists. It is who gets in, for how long, and who the end user actually trusts when they say yes.

Three hubs, and one country still waiting
The Nordic power market looks continuous from the outside. Travel east from Norway and you do not meet a hub with different interfaces. You meet no hub.

Elhub data without a market role
A power producer wants its own consumption and its own production back from Elhub. Access is solved. The problem is that the system meant to receive them was never built to talk to a hub.

The window before seven
Between midnight and a quarter to seven, a full day has to be collected, validated and delivered. The window has not grown, but since January 2024 four times as much has to pass through it.